Visit Outdoor Experience

Highway 19E bridge to Covered Bridge Park

SECTION CLASS:
2 - 3 (Normal Flow)
SECTION LENGTH:
7.3 miles

Have anything to add? Photos, additional information, corrections are welcome! Email us at and/or leave a comment below. Thanks!

Highway 19E bridge to Covered Bridge Park Features
Mile Name Class
1.5
2.5
7.3
Covered Bridge Weir Dam

This is a 2.5' concrete damn spill over onto a concrete shelf.  If you are going to run this make sure to do it on river left off the concrete deck that is against the bank.  Running the damn from left of center to river right could result in some serious injuries due to a line of limestone quarry boulders.

The portage for this damn on river right at the concrete steps that go down to the river just before the covered bridge.

3
comments powered by Disqus
Show the Full Site
Show the Mobile Site